Demolition Contractors Sydney: What to Check Before You Sign
Appointing a demolition contractor in Sydney? Check the SafeWork NSW licence class, insurance, waste destination and how the quote is itemised before you sign.
If you are appointing a demolition contractor in Sydney, four things decide whether you have a compliant job or a liability: the SafeWork NSW licence class, the insurance certificates, the licensed waste destination, and whether the quote separates asbestos and slab removal into their own lines. Everything else is detail.
Two quotes for the same house routinely differ by a wide margin, and almost never because one contractor is overcharging. They differ because they are quoting different scopes. This is the checklist we would want a builder or owner to use on us.
At a glance
- Check the SafeWork licence class, not just the number
- Confirm the trading name on the licence matches the business quoting
- Ask which licensed facility the waste goes to, then ask for the dockets
- Compare GST inclusive against GST inclusive
- A four-line quote cannot be compared to a detailed one
- The lowest quote usually has a scope gap, not a lower cost base
What should I verify before appointing anyone?
Licence. Get the SafeWork NSW asbestos removal licence number and confirm the trading name on it matches the business quoting. Then check the class. A Class B licence covers more than 10 square metres of non-friable material only. Any amount of friable material needs a Class A licence. If friable work appears anywhere in the quote, Class B is not enough.
Insurance. Ask for certificates of currency for public liability and workers compensation. If a worker is injured on your site without workers compensation cover, the exposure can reach the property owner and the head contractor.
Waste destination. Asbestos and demolition waste can only go to licensed facilities. Ask which facility, then ask for the tipping dockets after the job. Dockets are the only proof the material went where it was supposed to.
We publish our licences and insurance so this check is easy on us.
What should a demolition quote separate out?
| Line | Why it matters |
|---|---|
| Asbestos allowance | Should be a stated figure, not “if required” |
| Slab and footings | Separate line, or explicitly excluded |
| Disposal and tip fees | Charged by weight, so ask the assumed tonnage |
| Tree and vegetation removal | Often assumed not included |
| Service disconnection | Usually the client’s responsibility, so confirm |
| Site levelling and compaction | Confirm what “clean site” means |
| Demolition certificate | Should be stated |
| GST | Confirm inclusive or exclusive |
A quote with these lines can be compared. A quote with four lines cannot.
What are the warning signs?
- No licence number anywhere on the quote or the website
- Asbestos described as “included if found” with no figure against it
- Payment requested in full before mobilisation
- No site inspection, with a firm price issued over the phone
- No mention of where waste goes
- No written program or start date
- A price well below every other quote, with no explanation offered
The last one matters more on a builder’s job than an owner’s. Demolition is a short phase but it gates everything after it, so a contractor who cannot give a start date cannot give a finish date either.
Why does the cheapest quote usually cost more?
Because the savings arrive later. Unlicensed or undocumented work exposes you to regulatory penalties, clean-up costs if material is dumped illegally, and a property with no compliance trail when a lender, insurer or future buyer asks.
As Daniel Hall of First Choice Building put it after we demolished a house for him in Birchgrove:
“They knew I was working to a tight time frame so they got in and finished the job in two days.” Program certainty is what builders actually buy.
Our demolition checklist sets out what a clean handover looks like, our permits guide covers which approval pathway applies, and our guide to the knock down rebuild process shows where demolition sits inside a larger program.
Frequently asked questions
How long should a house demolition take?
5 to 10 working days for a standard single storey, 8 to 15 for a double storey or larger home, from start on site to a clean level pad. Asbestos removal is a separate phase before mechanical demolition begins.
Is asbestos always included in a demolition quote?
Sometimes, sometimes not. We quote it separately so you can see what you are paying for. Friable always costs more than bonded because it needs Class A removalists.
Can I get a fixed price without a site visit?
We will give a guide range over the phone, but we will not issue a fixed written quote without seeing the site. Asbestos, access, slab depth, tree clearance and services all change the number.
Do I need council approval to demolish?
Most NSW demolitions need either a Complying Development Certificate through a private certifier or a Development Application through council. Heritage items and conservation areas almost always need a DA.
Appointing a demolition contractor? Contact us and we will quote with asbestos, slab and disposal shown as separate lines so you can compare us line by line. Chomp Excavation & Demolition is family owned, has worked on thousands of demolition and asbestos projects, and works with Tier 1 builders across Sydney.