Demolition is the pre-planned and controlled mechanism for the deconstruction, razing, damaging, or wrecking of any building or structure, or any part of it. Since the process involved controlled destruction, professional companies need to prepare a careful demolition checklist before commencing. This plan is submitted with the local authority's request for demolition authorization.
The checklist primarily consists of the following aspects:
- A plan depicting the location of the building to be demolished
- The height of the building or the structural system
- The amount of damage to be made
All the relevant details are pre-planned according to the need for the demolition. Check out the following checklist to get a clear idea in this regard.
How to develop a demolition checklist?
- Permission should be taken from the local authority to carry the work.
- A demolition survey must be done to get all the details.
- A proper plan to demolish should be made.
- Check out the place and put safety barriers for the surroundings.
- Make a proper arrangement and then start off with the demolition procedure for each building at a time.
- Finally, using hauling equipment, remove all the debris and clean the place of demolition.
What are factors that affect a plan for demolition?
To go about with the demolishing plan, a survey is required to get all the necessary information. Accordingly, the demolition service providers would do the needful. These factors include:
- The Structural type: Different types of structures have different plans for demolition. For a steel structure and a concrete structure, for instance, the plan would be different.
- The Structural size: The size of the structure varies, and accordingly the plan of demolition alters too.
- The Structural location: In this case too, the location of a hilly area in comparison to a marine area is different. Accordingly, the demolition plan will be different.
- The barrier of noise, grime, and vibrations: These factors affect the method that causes a change in the plan of demolition.
- Availability of equipment: The availability of proper equipment is important in demolishing a structure. It varies and changes according to available equipment at disposal.
- Structural behavior: The behavior of the structures also varies from one building to another.
Permission to pass a demolition plan
Permissions to pass a plan for demolition can be of two types:
Permission for removing trees
The permission should be taken from the local council. Depending on the size and type of a structure, where it is located, the tree should be removed from a particular landscape.
Permission for protection of assets
To safeguard your crossover and footpath, permission for protecting assets is required before demolition work. The procedure of asking for demolishing of the building will require the council to approach the proprietor directly in order to apply for permission for asset protection.
Asbestos Removal Checklist
Asbestos can be found in the following materials throughout the home:
- Weatherboards and fiber cement cladding on the exterior
- Roofing tiles
- Cladding made of artificial bricks
- Cement corrugated roofing
- Pipes for evaporating waste
- Cement pipe columns
- Paint with texture
- Vinyl floor coverings or tiles
- Water pipes made of asbestos cement
- Switchboard millboard linings
Some of the reputed companies also offer asbestos removal services. Therefore, when you start looking for professionals offering demolition services, make sure to check out their allied services as well. Given that any kind of demolition involves the destruction of existing structures, it is imperative to take adequate safety measures. This ensures that you can prevent damage or loss of lives and property around the site of demolition. Being sensible, you can check out the best service providers around for professional support